Draper SL6 Instructions d'exploitation

Naviguer en ligne ou télécharger Instructions d'exploitation pour Supports de projecteur Draper SL6. Draper SL6 Operating instructions Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 6
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Copyright © 2009 Draper Inc. Form ScissorLift_220VInst09 Printed in U.S.A.
Caution:
Read instructions completely before proceeding.
Test lift prior to installation.
Follow instructions carefully. Installation contrary to instructions invalidates
warranty.
Do not obstruct operation of Scissor Lift with fi ngers or any object. Serious
injury or damage could result.
Scissor Lift is designed to accommodate ceiling suspended equip ment.
Equipment should not be allowed to rest on optional ceiling closure during
operation. (Refer to section titled “Installing Pro jec tor.”)
Entire bottom of unit must be unobstructed to permit proper op er a tion.
Suffi cient clearance must be allowed below projector or op tion al ceiling
closure: see chart on page 4.
Unit must be installed level (use a carpenter’s level).
Unit operates on 220V, 50 Hz. AC current.
Verify the show position when testing lift. Make required changes by
referring to adjustment instructions on page 6 of this document.
Note: Unit has been thoroughly inspected and tested at factory and found to be
operating properly prior to shipment.
Planning
Based on screen location and projector specifi cations, determine proper
position for projector in stal la tion.
Confi rm that there is adequate space for installation and operation. Minimum
clear ance above ceiling level varies according to Scissor Lift model, plus height
of projector, optional mounting bracket, optional ceiling closure, and optional
Environmental Air Space Housing.
Arrange to provide service access to the unit.
As Soon As Scissor Lift Arrives
Open carton and inspect for damage.
Locate the following parts:
A. The unit itself
B. Controls
C. Any optional equipment: Environmental Air Space Housing, closure panel or
ceiling fi nish kit (all ship in separate cartons).
Test lift prior to installation.
Installation/Operating Instructions
220V SL & SLX Scissor Lift Video Projector Lift by Draper
Hanging Unit
Please note: If using Environmental Air Space Housing option, go to
Environmental Air Space Housing instructions on page 2.
The Scissor Lift may be installed in a variety of ways; recessed above the ceiling,
or sus pend ed below the ceiling. The lift should be supported by four ½" thread ed
mount ing rods. If ceiling recessed, the entire unit (including the projector) should
set approximately 1½" above the fi n ished ceiling in its “stored” position. The
threaded rods should pass through the corner mount ing fl anges and be secured
by nuts above and below. Use a thread locking compound such as Loctite
®
#242
(provided). The unit should then be guy wired or blocked to pre vent swing ing.
All installations should observe the following guidelines:
Access from above the unit, with enough clearance to remove the top cover,
should be pro vid ed in case service is re quired. If installing above a hard ceiling,
optional Draper Access Panels are available to allow access to the unit.
Installer must ensure that all fasteners and supports are of ad e quate strength to
securely support Scissor Lift and projector.
Fastening methods must be suitable for mounting surface, and se cure ly
anchored so that vibration or abusive pulling on unit will not weaken
installation.
Electrical Connections
Unit operates on 220V AC, 50 Hz. current. Removing the top cover of the unit
and opening the electrical box ex poses ter mi nals for fi eld con nec tions. Unit is
shipped with internal wiring com plete. Wire to connect unit to power supply should
be furnished by in stall er. Con nec tions should be made in accordance with wiring
di a gram, and wiring should com ply with na tion al and local elec tri cal codes. All
op er at ing switches should be “off” before power is con nect ed.
Scissor Lift should be operated and checked prior to installing pro jec tor and/or
optional ceiling closure.
Standard switch shown below comes with 22.86 meters of cable and should be
plugged in to box on front of top pan of lift to control lift.
Loctite
®
is a registered trademark of Henkel Corporation.
These Installation/Operating Instructions are available in the offi cial language of
the country where you purchase the product. Please contact your distributor to
request a copy.
Vous pourriez demander les instructions d’installation et d’opération traduises
dans la langue offi cielle du pays ou vous achetez le produit. Veuillez demander à
votre distributeur.
Die Gebrauchsanweisung für Installation und Konstruktion sind in der offi ziellen
Sprache des Landes, indem Sie das Produkt gekauft haben, vorhanden. Fragen
Sie die jeweilige Verkaufs-Abteilung.
If you encounter any diffi culties installing or servicing your Scissor Lift, call your
dealer or Draper, Inc. in Spiceland, In di ana, 765-987-7999; or fax 765-987-7142.
Unit should be level, with weight shared more or less equally by all four
threaded mount ing rods.
Bottom of unit must be unobstructed after installation. Suffi cient clear ance
must be allowed below projector or optional ceiling closure: 4' for Model SL4, 5'
for Model SL5, etc.; 11' for Model SLX11, 12' for Model SLX12, etc.
Do not use unit to support adjacent ceiling, light fi xtures, etc.
Do not complete the ceiling below unit until electrical connections have been
completed and unit has been operated successfully.
We recommend that safety cables be attached to the Scissor Lift for added
security (a sound in stal la tion practice with overhead equipment).
When the Scissor Lift is to be installed in “other space used for environmental
air” the optional environmental air space housing must be installed per
instructions to isolate the lift from the “other space used for environmental air.
Operation
When unit is fi rst operated, be cautious! If unit fails to operate when toggle
switch is fl ipped “down”, return switch to “off” and recheck elec tri cal con nec tions
before pro ceed ing. Cycle unit down and up several times to confi rm sat is fac to ry
operation.
Standard Single Station Control (CE Approved)One, 12V toggle switch:
mov ing 3-po si tion toggle switch to “down” po si tion will start lift down. Moving toggle
switch to “up” will start lift up. When lift is in “show” position, travel will au to mat i cal ly
be stopped by factory set limit switch es. When ev er switch is placed in center “off
position, operation will stop. One, 12V key switch will lower lift from “show” to
“service” position.
Video Interface Control (CE Approved)This optional 12V control device allows
the Scissor Lift switch to control the operation of a Draper motorized pro jec tion
screen via a relay.
Multiple Station Control (Not CE Approved)—Optional, moves lift from “stored”
to “show” position only. Each switch ing station has a 3-button switch with “up”,
“down”, and “off” buttons. Lift starts up or down when ap pro pri ate button is
pressed, and may be stopped by pressing “off” button. Factory set limit switch es
stop lift automatically when pro jec tor is in “show” position.
Key Operated Switch (Not CE Approved)If ordered, a single station, key-
operated three position (up/off/down) switch is available. Multiple Station Con-trol
re quired for this option. Moves lift from “stored” to “show” positions only.
Infrared or Radio Frequency Remote Control (CE Approved)If ordered, a
three-button transmitter is provided, with “up”, “down”, and “stop” buttons. Unit
starts up or down when appropriate button is pressed, and may be stopped by
pressing “off button. Factory set limit switches stop unit au to mat i cal ly when
projector is in “show” po si tion. Only controls "show" and "stored" positions.
UP
DOWN
OFF
OFF
Vue de la page 0
1 2 3 4 5 6

Résumé du contenu

Page 1

Copyright © 2009 Draper Inc. Form ScissorLift_220VInst09 Printed in U.S.A.Caution:➀ Read instructions completely before proceeding.➁ Test lift pri

Page 2 - page 2 of 6

220V Scissor Lift by Draper page 2 of 6www.draperinc.com(765) 987-7999275864319111012613Parts List for Scissor Lift Environmental Air Space HousingIt

Page 3 - page 3 of 6

220V Scissor Lift by Draper page 3 of 6Ceiling Finish KitOptional Ceiling Closure for Scissor LiftThreaded RodTrim FrameClosure PanInstaller to Drill

Page 4 - (765) 987-799

220V Scissor Lift by Draper page 4 of 6 Maximum Lowering Retracted Model Distance Height 1 SL4 122 cm 21 cm SL5 152 cm 24 cm SL6 183 cm

Page 5

220V Scissor Lift by Draper page 5 of 6Transformer N GRD L1 220v AC SupplyDashed wiring by electrician YW YW BK BK BK BK BK BK BK BK BK WH BE 1 2 3 4

Page 6 - Figure B

www.draperinc.com(765) 987-7999220V Scissor Lift by Draper page 6 of 6Adjusting Show Position (Up to Standard Position)➀ Find the empty slot in the

Commentaires sur ces manuels

Pas de commentaire